The current site is a flat roof and is located in Kostinbrod, Sofia region.
Before applying the oiled waterproofing, the base had to be prepared.
As can be seen from the photos, the building is newly built and the roof has not yet been plastered after the installation of fiber.
We followed the following steps for roof waterproofing: